Scheuerle aids submarine's final voyage

For one submarine in particular, its last journey of note was recently carried out using heavy load transporters from Scheuerle. With a weight of 2,500
Jan. 1, 2007

For one submarine in particular, its last journey of note was recently carried out using heavy load transporters from Scheuerle. With a weight of 2,500 tonnes, the 76-meter-long colossus, “Akishima”, was taken to its final resting place in front of the Yamato Museum in Kure, Japan. The complete operation was managed by Sankyu, a Japanese heavy load experts that has a fleet of SPMT modular heavy load transporters supplied by Scheuerle.

A total of 86 axle lines and six power pack units were used to bring the gigantic underwater vessel to its destination. With a diameter of 13.5 meters and a height of 18.1 meters, the submarine was held by specially designed retaining devices and set down inch-perfect in front of the museum.

The electronic multi-directional steering system of the SPMT heavy-load transporters allowed extremely accurate maneuvering of the large load. The client for this transportation task was the Japanese Naval Defense Forces.

Sign up for Trailer Body eNewsletters
Get the latest news and updates